10 things to know before you buy Solar panels

Practical buying checks for solar panels, with the jargon explained.

  1. Compare annual yield, not panel count A design should estimate yearly kilowatt-hours using roof direction, pitch, local climate and shading. More panels do not guarantee more useful energy if they occupy a poor roof area or exceed inverter capability.

  2. Shading needs a site-specific design Chimneys, trees and neighbouring roofs can reduce a string of panels, especially when shade moves across it. Ask for a shade analysis and the reason for any optimisers or microinverters rather than assuming extra electronics are always necessary.

  3. Panel watts use laboratory conditions The watt-peak rating is measured under standard bright, cool test conditions and is not continuous real-world output. Temperature coefficient shows how output falls as panels heat up; a smaller negative percentage is better.

  4. Match inverter sizing deliberately The inverter converts panel direct current to household alternating current and is often rated below total panel peak power. Some deliberate oversizing of the array can improve annual yield, but clipping losses and voltage limits should be modelled.

  5. Roof condition comes first Panels may remain for 25 years or more, so repair ageing tiles, felt or structural defects before installation. Confirm the mounting system suits the exact roof covering and that penetrations, wind loads and edge clearances are properly designed.

  6. Understand export arrangements Generation first serves loads operating in the home, while surplus flows to the grid unless stored or diverted. Compare current export tariffs and meter requirements; “free electricity” claims should not assume every generated unit is consumed.

  7. Accreditation protects the purchase Check the current MCS status of the installer and equipment where export payments or consumer-code protections require it. Obtain the generation estimate, schematic, warranties, commissioning records and network paperwork in the customer’s name.

  8. Product and workmanship warranties differ Panel product warranties cover defects, performance warranties cover gradual output decline, and installation workmanship is separate. Check who handles a claim locally and whether labour, access equipment and replacement shipping are included.

  9. Plan cable and equipment positions Agree visible cable routes, inverter location, isolators and meter equipment before work begins. Inverters need ventilation and accessible servicing; long exposed direct-current cable routes require careful mechanical and fire protection.

  10. Monitoring should show actionable faults A useful portal displays daily generation and alerts when the inverter stops, without depending entirely on a subscription. Compare actual monthly output with the design range, accounting for weather, so failures do not go unnoticed for a season.